Project Profile

 
RVWC Solar Project

Overview

Solar Power Partners (SPP) developed a 99.2 kW solar energy system for the Redwood Valley Water District using a solar Power Purchase Agreement. Under the terms of the solar PPA, no up-front capital was required from the Water District and SPP operates and maintains the system. The system annually produces enough renewable energy to offset 102 metric tons of carbon dioxide, or the equivalent to emissions from 11,578 gallons of gasoline consumed.

Results

SPP’s solar PPA allowed the Redwood Valley Water District to realize renewable energy and a reduced carbon footprint without any up-front or long term costs. The system, under SPP operation and maintenance, continues to perform above expectation.

COMPLETION DATE
March 2008

INSTALLATION TYPE:
Fixed ground mount

SYSTEM SIZE (DC):
99.2 kW

ESTIMATED ANNUAL OUTPUT:
14,3372 kWh

pdf icon Download a PDF
of this project profile

Other water district project profiles:

West County Waste Water District

Valley Center Water District

 

 

 

line spacer
shaddow
shadow shadow shadow